A typical project follows the life cycle depicted in the picture. Each phase has distinct activities and clear criteria that mark the completion of the phase. The Software Process Database (SPDB) is not only a repository where knowledge assets generated by the project are stored but also a knowledge bank that can be exploited for smarter planning.
ANALYSIS
Analysis phase is where the software requirements are detailed out and the Functional Specifications Document (FSD) is prepared. This is reviewed and verified against the requirements established in the Proposal document. The System Test Criteria (STC) is also prepared at this stage, which becomes an input for the testing phase.
The following Procedures & Guidelines are referred to in this phase:
Requirement Analysis Procedure
Peer Review Procedure
Requirement Analysis Guideline
Functional Specification Document (FSD) Template
Gap Analysis Document (GAD) Template
System Test Criteria (STC) Template
Peer Review Report Template
DESIGN
The Design phase follows where the software solution is designed and the Architectural Design Document (ADD) and the Detailed Design Document (DDD) are prepared, reviewed and verified against the FSD.
The following Procedures & Guidelines apply to this phase:
Design Procedure
Peer Review Procedure
Design Guidelines
Architectural Design Document (ADD) Template
Detailed Design Document (DDD) Template
Combined Design Document (CDD) Template
Template for Traceability Matrix
Peer Review Report Template
CONSTRUCTION
Once the design is frozen, the Construction phase is started which involves development of code as per the program specifications drawn up and approved. At Nucleus we typically write the program specifications in this phase though it is traditionally a design activity.
The following Procedures & Guidelines are referred to in this phase:
Development Procedure
Coding Guidelines
Finness Development Standard
Java Coding Standard
NSEL Coding Standard
Oracle Coding Standard
Powerbuilder Coding Standard
Finness Coding Checklist
Program Specifications (for EJB) Template
Program Specifications Template
Program Submission Form
Unit Test Plan Template
Unit Checklist
Peer Review Procedure
SRS Template
SYSTEM INTEGRATED TESTING
The System Integrated Testing phase involves the complete testing of the developed software from installation to operations as per a developed Software Test Plan (STP). The software may go through iterative test cycles until it is bug free.
The Procedures & Guidelines to be referred to are:
Testing Procedure
Peer Review Procedure
Testing Guidelines
System Test Plan Template
Template for Traceability Matrix
SRS Form
QUALITY CONTROL TESTING
The recently added Quality Control Test is aimed at improving the overall quality of Nucleus deliveries as well as help in identifying defect injection and defect capture effectiveness.
The QCT Team will involve itself in the project from an early stage and subject it to an independent test in a controlled environment.
At the moment there are no special procedures defined for this phase and it follows the same processes as the System Integrated Testing phase.
USER ACCEPTANCE TESTING
Client user representatives typically hold the User Acceptance Testing (UAT) at the customer’s site. Our involvement is in terms of installation of the software, its setup, hand-holding the user group in using the software and correcting any defects/changes detected in the UAT.
IMPLEMENTATION
The implementation phase commences once the software is accepted by the customer (post-UAT). The phase involves installation of the software for live use, setup of the application, user training, conversion of data (in case necessary), support users on its use.
Daily tracking of its usage is a key activity in the initial stages of the software's going live. Review of transactions being executed on the system and processing being done is advised.
The conversion of data is a complex activity that needs special focus. Apart from drawing up a strategy for transition of data, we must outline a reconciliation strategy and a test strategy for the converted data.
Requirements: Functional Specification Document
Gap Analysis Document.
Design: Architectural Design Document
Combined Design Document
Detailed Design Document
Impact Analysis Document
Program Specifications
Coding/Development: Program Submission
Code Header
Testing/QCT: QCT Acceptance
Project Analysis Report
QCT Weekly Progress Report
Quality Control Test Plan
System Test Plan
Unit Test Plan
Senior Management Review (QCT)
Release: Configuration Item Release
Customer Release Note
Maintenance Annual Technical Support
Maintenance Plan
Progress Report
Project Board Review (Support)
Project Schedule (Support Projects)
Documentation: User Manuals
Various lifecycle models descriptions
o Waterfall
o Spiral
o Prototyping (Evolutionary Prototyping)
o Incremental